Sargon Engineering

News

Piping Design Work on Muja Power Station Complete

Sargon Engineering has successfully completed a piping design & engineering contract for APS/ Siemens, for a significant turbine hydraulics system. Isometric drawings and pipe stress analyses were completed as part of this work.

-->
Google+