Sargon Engineering

News

Refinery

Rare Earths Project Review

David Schmidt has completed a brief, high-level, due diligence review of Salazar Minerals’ Rare Earths project for Xstract Mining Consultants.

Tronox Chemicals Batching Plants

Sargon Engineering helped prepare a preliminary 3D design, arrangement drawings and accompanying cost estimate for a chemical batching plant, to potentially be located at the Tronox pigment plant.

Iron Ore in the NT

After issuing our estimates to WDR for fine beneficiation in mid February, we are exploring the trade-off between yield and milling costs by evaluating

Udokan Copper Project

Sargon Engineering has just completed the development of an interesting mass and energy balance model in Metsim.

Mt Nimba Desktop Study Interim Report

After ten weeks of diligent work, the Sargon Engineering team has issued our interim report to Xstract.  Its pages are packed with useful information which encompasses mine infrastructure,

Potash Extraction PFD’s

We are pleased to report that we just completed a drafting job to help out Strategic Metallurgy with our experienced drafting resources.

Cu/Pb/Zn Concept Study Begins

Approval has been granted for the commencement of work on conceptual layouts & cost estimates for a Heavy Media Plant and copper-lead-zinc concentrator.

-->
Google+ aaa